Reference List

 

Coal Fired Power Station
 
 
Coal Fired Power Station - Orot Rabin Site
 
Orot Rabin 1-4 - 4 x 365 MW   
Commencement : 1981-1984
Steam Cycle: Sub-critical 142 ata/ 538 0c
Environmental features: ESP + SO3 FGC
Projects Group Scope: EPCM
PM+FGD+SCR- 2015-2017
 
 
Orot Rabin 5-6 -  2 x 575 MW
Commencement : 1995-1996
Steam Cycle: Sub-critical 175 ata/ 535 0c
Environmental features: ESP + SO3 FGC
Projects Group Scope: EPCM
PM+FGD+SCR- 2012-2013
 
 

Coal Fired Power Station - Rutenberg Site
 
Rutenberg 1-2 - 2 x 575 MW   
Commencement : 1990-1991
Steam Cycle: Sub-critical 175 ata/ 535 0c
Environmental features: ESP+SO3
Projects Group Scope: EPCM
PM+FGD+SCR- 2013-2014
 
 
Rutenberg 3-4 - 2 x 550 MW   
Commencement : 2000-2001
Steam Cycle: Sub-critical 169 ata/ 538 0c
Environmental features: Low Nox Burners + ESP
+ FGD + SCR Provision
Projects Group Scope: EPCM
SCR scheduled to 2015-16
 
 

Future - Rutenberg D
2 x 630 MW
Steam Cycle: Super-critical 255 ata/ 560 0c
Environmental features: ESP +SO3 FGC+FGD+ SCR
Planned : 2015-16
Projects Group Scope: EPCM
 
 
International Projects:

Coal Fired Power Stations – Medupi & Kusile
South Africa 12X750 MW
Client: Alstom France
Contract award: October 2007
Project group scope of design:
           Turbine building and ACC General Arrangement
           Data for Civil design
           Piping & Support design
           Piping Analysis
           Instrument Location Drawings
         Cable Trays Routing
Completion date – 2011 (ongoing project)
  
 
Coal Power Plants
Lalitpur -central India 3 x 660 MW
Client: Bajaj Infrastructure Development Company Ltd. (BIDCO)
Integration Services (Consultancy for Owner Engineer) in fields of design, construction and start-up for three coals fired, 660 MW each, super-critical power stations.
Completion date – 2016 (ongoing project)



Combined Cycle
 
“Add On” Project – Ramat Hovav
1 x 120 MW
Commencement : 1999
HRSG + Steam turbine +Air Cooled Condenser
 

“Add On” Project – Hagit (units 7 & 8)
1 x 120 MW
Commencement : 2002
HRSG + Steam turbine +Air Cooled Condenser
 
Combined Cycle – Eshkol
1 x 370 MW
Commencement : 2003 open cycle, 2005 combined cycle
2 Shafts configuration - seawater cooled
 

Combined Cycle – Alon Tavor
1 x 370 MW
Commencement : 2004 open cycle, 2008 combined cycle
2 Shafts configuration - Treated waste water cooled
 
Combined Cycle – Gezer (units 3&4)
2 x 370 MW
Commencement : unit 3: 2005 open cycle ; 2007 combined cycle
                           unit 4: 2006 open cycle ; 2008 combined cycle
1 Shaft configuration - Treated waste water cooled
 

Combined Cycle – Hagit (unit 2 )
1 x 370 MW
Commencement : 2007
1 Shaft - Air cooled
 

Combined Cycle – Haifa (units 3&4)
2 x 370 MW
Commencement : 2010 open cycle, Future 2011 combined cycle
 
Combined Cycle – Tzafit (units 3&4)
1 x 370 MW
Commencement : 2006 open cycle, Future 2013 combined cycle
2 Shafts configuration - Air cooled
 
Future Combined Cycles – Hagit (unit 9)
1 x 370 MW
Commencement : 2010 open cycle, future 2013 combined cycle
2 Shafts- Air cooled
 
Future Combined Cycles –Ramat Hovav (units 8&9)
1 x 370 MW
Commencement : 2010 open cycle, future 2013 combined cycle
2 Shafts- Air cooled
 
Future Combined Cycles –Eshkol (units 3&4)
3 x 370 MW
Commencement : 2010 open cycle, future 2013 combined cycle
2 Shafts- Seawater cooled
 
 
Future Combined Cycle – Alon Tavor (units 5&6)
1 x 370 MW
Commencement : 2012 open cycle , future
2 Shaft - Air cooled
 
 
International Projects:

Combined Cycle – Aliveri
Greece - 420 MW
Client: Metka S.A. for Public Power Company of Greece
Natural Gas Fired
Contract award: September 2007
Project group scope of design: 
Complete Engineering, Planning and Design(Process, Mechanical, Control, Electrical, Civil) for main Power Island
Completion date – 2011 (ongoing project)

 
Gas Turbine
 
Gas Turbine - Ramat Hovav (units 1&2)
2 x 110 MW
Commencement :1989
 
Gas Turbine - Alon Tavor (units 1&2)
2 x 110 MW
Commencement :1991-1992
 
Industrial Gas Turbine – Tzafit (units 1&2)
2 x 110 MW
Commencement :1990
 
Gas Turbine - Ramat Hovav (units 3&4)
2 x 110 MW
Commencement :1993
 
Gas Turbine – Hagit (units 3-6 )
4 x 120 MW
Commencement :1994 - 1996
 
 
Industrial Gas Turbine - Eilat
1 x 35 MW
Commencement :1996
 
Industrial Gas Turbine - Atarot
2 x 35 MW
Commencement :1997
 
Industrial Gas Turbine – Gezer (units 11&12 ; 21&22 )
4 x 140 MW
Commencement :1999
 
2 Gas Turbine – Ramat Hovav- unit 6,7
2 x 120 MW
Commencement :2009
 
 
 
Oil / GAS
 
Eshkol
4 x 228 MW
Start-Up: 2003
 
Reading
2 x 214 MW
Start-Up: 2005
 
Haifa
2 x 241 MW
Start-Up: 2007
 
 
 
 
Switching & Sub- Stations
 
Total of 123 Switching and Substations:
9 400/161/24KV (GIS & AIS) Switching Stations
3 161/24KV (GIS & AIS) Switching Stations
26 Indoor (GIS) 161/13-36KV Substations
70 Outdoor (AIS) 161/13-36KV Substations
14 Temporary 161/24-36KV Substations
 
 
400KV Switching Stations
 
Zafit Switching Station
400KV AIS:
5 Diameters (One and a half Circuit Breaker)
6 over head lines
3 650MVA 400/161/36KV transformers
161KV AIS:
4 Busbars
2 30MVA 161/24KV transformers
10 over head lines
3 generation lines
24 KV AIS switchgear
 
 
Zvulun Switching Station
400KV GIS:
4 Diameters (One and a half Circuit Breaker)
2 over head lines
2 650MVA 400/161/36KV transformers
161KV GIS:
4 Busbars
2 45MVA 161/24KV transformers
14 over head lines
24 KV switchgear
 
 
Caesarea Switching Station
400KV GIS:
4 Diameters (One and a half Circuit Breaker)
6 over head lines
2 650MVA 400/161/36KV transformers
161KV GIS:
6 Busbars
4 45MVA 161/24KV transformers
17 over head lines
7 generation lines
24 KV switchgear
 
 
Petah-tiqwa Switching Station
400KV GIS:
4 Diameters (One and a half Circuit Breaker)
4 over head lines
3 650MVA 400/161/36KV transformers
161KV GIS:
4 Busbars
4 45MVA 161/24KV transformers
14 over head lines
24 KV switchgear
 
 
Gan Sorek Switching Station
400KV GIS:
4 Diameters (One and a half Circuit Breaker)
4 over head lines
2 650MVA 400/161/36KV transformers
161KV GIS:
4 Busbars
3 45MVA 161/24KV transformers
17 over head lines
24 KV switchgear
 
 
Even Sapir Switching Station
400KV GIS:
2 Diameters (One and a half Circuit Breaker)
2 over head lines
2 650MVA 400/161/36KV transformers
161KV GIS:
4 Busbars
2 45MVA 161/24KV transformers
1 100MVA 161/110KV transformer
17 over head lines
24 KV switchgear
 
 
Ramat Hovav Switching Station
400KV GIS:
3 Diameters (One and a half Circuit Breaker)
6 over head lines
2 generation lines
2 650MVA 400/161/36KV transformers
161KV AIS:
4 Busbars
2 45MVA 161/24KV transformers
11 over head lines
5 generation lines
24 KV switchgear
 
 
Hagit Switching Station
400KV GIS:
2 busbars
2 over head lines
4 generation lines
 
 
Gezer Switching Station
400KV GIS:
6 Diameters (One and a half Circuit Breaker)
6 over head lines
4 generation lines
2 650MVA 400/161/36KV transformers
161KV GIS:
4 Busbars
2 45MVA 161/24KV transformers
8 over head lines
24 KV switchgear
 
  
 
 
 
Retrofits
 
- Waste Management Systems (20 m3/hr for 5 sites)
- Plant Control and Data Processing Systems
- Condenser Re-tube to Titanium Tubes (4 x 360 MW)
- Ash Handling Systems
- Retrofit of 6 Gas Turbine Units (LFO Fired) to dry low NOx Systems
- HVAC Systems

International Projects:Ramat Hovav - Combined Cycle 

Oil to Gas retrofits -
Conversion Israel Chemicals Factories and Plants to Natural Gas Firing
Client: Israel Chemicals Ltd. (ICL).
·        Bromine Compounds Ltd. – Located at Ramat Hovav
·        Periclase Ltd. – Located at Mishor Rotem
·        Rotem Amfert Negev Ltd. – Located at Mishor Rotem
·        Dead Sea Works Ltd. – Located at Sodom
·        Magnesium Ltd. – Located at Sodom
Scope of design:
  • Engineering and Consultancy for conversion all equipment and facilities of existing burners to natural gas firing (dual/triple fuel),
  • Engineering, Planning and Design (Process, Mechanical, Control, Electrical, Civil, Architect, etc) of the natural gas distribution systems.
  • Erection and commissioning support.
Completion date – 2011 (ongoing project)


 
 
Solar Thermal Power Station

International Projects:
Lebrija
, Spain 50 MW
Client: Siemens CSP- SOLEL Solar Systems Ltd. & Sacyr Vallehermoso, S.A
 Integration Engineering Services for the Power Island
 Scope of design:
·         Heat and Mass balances.
·         PFD, P&ID and C&ID.
·         DCS RFP and Contract.
·         Technical documentation review.
Completion date – 2011 (ongoing project)


Ramat Hovav