Project Name:
|
OROT RABIN Units 5+6 (MD "B")
|
|
Synchronization Date:
|
July 1996
|
|
Main Project Data:
|
|
|
Project Type:
|
|
Pulverized bituminous sub-critical coal fire units
|
|
Project Size:
|
|
575 MW at nominal continues rate
|
|
Fuels:
|
Main
|
Coal
|
|
|
Secondary:
|
Oil grade no. 6
|
|
|
Start-up fuel:
|
Oil Grade no.2
|
|
Location:
|
|
Close to northen Hadera town along the Mediterranean Sea shore in Israel
|
|
Main Project Parameters:
|
|
|
Steam Cycle:
|
Sub critical
|
|
Main Steam Capacity:
|
1550 ton/hr
|
|
Main Steam Pressure
|
175 ata
|
|
Main Steam Temperature:
|
535 0C
|
|
Reheat Steam Pressure
|
40 ata
|
|
Reheat Steam Temperature:
|
535 0C
|
|
Feed water Temperature
|
250 0C
|
|
Cooling media:
|
Sea water
|
|
Frequency:
|
50 Hz
|
|
Electrical energy supply at:
|
6.9 kV/0.4 kV
|
|
Environmental Data:
|
|
|
Emission
|
Actual Value
|
Retrofit Value
(stage I)
|
Retrofit Value
(stage II)
|
|
SOX
[mg/dNm3 @ 6% O2]:
|
2200
|
200 (with FGD)
|
200
|
|
NOX
[mg/dNm3 @ 6% O2]:
|
850
|
600 (with PM)
|
200 (with SCR)
|
|
Particle Mater
[mg/dNm3 @ 6% O2]:
|
50
|
30
|
30
|
|
CO2
[mg/dNm3 @ 6% O2]:
|
250
|
-
|
-
|
|
Environmental Features:
|
ESP+SO3 FGC
|
|
Low NOx:
|
scheduled to 2008
|
|
FGD:
|
scheduled to 2011
|
|
SCR:
|
scheduled to 2013
|
|
Project Organization:
|
|
|
Equipment Bids Number:
|
1000
|
|
Construction Bids Number:
|
276
|
|
Main equipment manufacturers:
|
|
Equipment
|
Manufacturer
|
Equipment
|
Manufacturer
|
Equipment
|
Manufacturer
|
|
Turbine:
|
MAN
|
Generator
|
MAN
|
Boiler:
|
Combustion Engineering
|
|
Fans:
|
T.L.T. Babcock
|
Feed Water Pumps:
|
Pacific Pumps
|
FGD
|
-------------------
|
|
Condenser
|
Southwestern Engineering
|
Main Transformers
|
General Electric+Elco
|
Main Control System:
|
Baily controls
|
|
ESP
|
Combustion Engineering
|
Dearator
|
Ecodyne Graver
|
Fly Ash handling/
extraction
|
Moeller
|
|
By Products:
Wall board quality gypsum (from the FGD while installed), cement quality dry fly ash, road filling quality bottom ash wetted by drinking water
|
|
Engineering Projects Group Scope of Work: Engineering Procurement Construction Management (EPCM)
|