Home | Contact Us | IR
  About Us  |   Engineering Division  |   Construction Division  |   Projects  |   Environmental Strategy  |   Quality Policy 
Projects Management
Power Plants
Coal Fired - list
Combined Cycles - list
Oil/Gas - list
Gas and Industrial Turbines - list
Rutenberg Site
Eshkol Site
Orot Rabin Site
Hagit Site
Gezer Site
Ramat Hovav Site
Tzafit site
Haifa site
Alon Tavor site
Environmental retrofit projects
Switching and Sub-Stations
Implementation and Retrofit
Structures and buildings
Consultancy And Studies
News Room
Videos
Articles
Reference List
Projects Power Plants Orot Rabin Site
Projects
Orot Rabin Site


Project Name:
OROT RABIN Units 1-4 (MD "A")
Synchronization Date:
April 1984
Main Project Data:
 
Project Type:
 
Pulverized bituminous sub-critical coal fire units
Project Size:
 
360 MW at nominal continues rate
Fuels:
Main:
Coal
 
Secondary:
Oil grade no. 6
 
Start-up fuel:
Oil Grade no.2
Location:
 
Close to northen Hadera town along the Mediterranean Sea shore in Israel
Main Project Parameters:
 
Steam Cycle:
Sub critical
Main Steam Capacity:
1107 ton/hr      
Main Steam Pressure
137 ata
Main Steam Temperature:
537.8 0C
Reheat Steam Pressure
32.46 ata
Reheat Steam Temperature:
537.8 0C
Feed water Temperature
242 0C
Cooling media:
Sea water
Frequency:
50 Hz
Electrical energy supply at:
6.9 kV/0.4 kV
Environmental Data:
 
Emission
Actual Value
Retrofit Value
(stage I)
Retrofit Value
(stage II)
SOX
[mg/dNm3 @ 6% O2]:
2200
200 (with FGD)
200
NOX
[mg/dNm3 @ 6% O2]:
1350
650 (with PM)
200 (with SCR)
Particle Mater
[mg/dNm3 @ 6% O2]:
50
30
30
CO2
[mg/dNm3 @ 6% O2]:
250
-
-
Environmental Features:
ESP+SO3 FGC
Low NOx:
scheduled to 2010
FGD:
scheduled to 2013
SCR:
scheduled to 2016
Project Organization:
 
Equipment Bids Number:
~300
Construction Bids Number:
350
Main equipment manufacturers:
Equipment
Manufacturer
Equipment
Manufacturer
Equipment
Manufacturer
Turbine:
General Electric (GE)
Generator
Westinghouse /GE
Boiler:
Babcock & Wilcox
Fans:
T.L.T Babcock
Feed Water Pumps:
Pacific Pumps
FGD
----------
Condenser
Senior
Main Transformers
General Electric
Main Control System:
L&N
ESP
Babcock & Wilcox
Dearator
Graver
Fly Ash handling/
extraction
UCC
By Products:
Cement quality dry fly ash, road filling quality bottom ash wetted by sea water
Engineering Projects Group Scope of Work: Engineering Procurement Construction Management (EPCM)

Project Name:
OROT RABIN Units 5+6 (MD "B")
Synchronization Date:
July 1996
Main Project Data:
 
Project Type:
 
Pulverized bituminous sub-critical coal fire units           
Project Size:
 
575 MW at nominal continues rate
Fuels:
Main
Coal
 
Secondary:
Oil grade no. 6
 
Start-up fuel:
Oil Grade no.2
Location:
 
Close to northen Hadera town along the Mediterranean Sea shore in Israel
Main Project Parameters:
 
Steam Cycle:
Sub critical
Main Steam Capacity:
1550 ton/hr
Main Steam Pressure
175 ata           
Main Steam Temperature:
535 0C
Reheat Steam Pressure
40 ata  
Reheat Steam Temperature:
535 0C
Feed water Temperature
250 0C
Cooling media:
Sea water
Frequency:
50 Hz
Electrical energy supply at:
6.9 kV/0.4 kV
Environmental Data:
 
Emission
Actual Value
Retrofit Value
(stage I)
Retrofit Value
(stage II)
SOX
[mg/dNm3 @ 6% O2]:
2200
200 (with FGD)
200
NOX
[mg/dNm3 @ 6% O2]:
850
600 (with PM)
200 (with SCR)
Particle Mater
[mg/dNm3 @ 6% O2]:
50
30
30
CO2
[mg/dNm3 @ 6% O2]:
250
-
-
Environmental Features:
ESP+SO3 FGC
Low NOx:
scheduled to 2008
FGD:
scheduled to 2011
SCR:
scheduled to 2013
Project Organization:
 
Equipment Bids Number:
1000
Construction Bids Number:
276
Main equipment manufacturers:
Equipment
Manufacturer
Equipment
Manufacturer
Equipment
Manufacturer
Turbine:
MAN
Generator
MAN
Boiler:
Combustion Engineering
Fans:
T.L.T. Babcock
Feed Water Pumps:
Pacific Pumps
FGD
-------------------
Condenser
Southwestern Engineering
Main Transformers
General Electric+Elco
Main Control System:
Baily controls 
ESP
Combustion Engineering
Dearator
Ecodyne Graver
Fly Ash handling/
extraction
Moeller
By Products:
Wall board quality gypsum (from the FGD while installed), cement quality dry fly ash, road filling quality bottom ash wetted by drinking water
Engineering Projects Group Scope of Work: Engineering Procurement Construction Management (EPCM)